banner
会社のニュース
Factory Assembly Test Completed – GT4 Double Post ZAM Steel Ground Mount 2026-10-10

Factory Assembly Test Completed – GT4 Double Post ZAM Steel for 1.4kN/m² Snow & 30m/s Wind

Another successful pre-shipment test at HQ Mount!

We just completed a full factory assembly test for a GT4 double post ground mounting system – ZAM coating steel, engineered for 1.4 kN/m² snow load and 30 m/s wind speed.

Project Specifications:

✅ System: GT4 Double Post Ground Mount

✅ Material: ZAM Coating Steel

✅ Profile: C160 with 3mm thickness – engineered for the load

✅ Design Loads: 1.4 kN/m² snow | 30 m/s wind

✅ Panel Layout: 2 panels portrait

✅ Panel Type: Bifacial

✅ Ground Clearance: 1m – optimized for bifacial gain

Why we test before shipping:

✔️ Verify every component fits perfectly

✔️ Confirm structural alignment and integrity

✔️ Eliminate on-site surprises

✔️ Ensure fast, trouble-free installation

⚡ Production Capacity: Over 80MW/month | Strict QC at every step

HQ Mount – Direct Manufacturer Since 2008 | 15,000m² Factory | 50GW+ Supplied






ホーム

製品

会社

接触